Big extension & fast renewal
The existing company of 8 ha was extended with approx. 10 ha to a company of 18 ha in total. Directly after this successful extension, it was decided to renew the existing 8 ha. The result was a complete new modern tomato production company of 18 ha. More renewals and extensions were realized in the next few years.
1st phase: expansion of the 8 ha company with 100,440 m2 greenhouse, 1,580 m2 technical areas, 3,600 m2 shipping building and 360 m2 floor area canteen, offices etc.
2nd phase: renewal of the existing 8 ha (80,610 m2 greenhouse, 2,400 m2 water storage tank, 1,780 m2 technical area, 320 m2 canteen, offices etc.)
3rd phase: renewal of approx. 38,000 m2 greenhouses
4th phase: expansion with approx. 24,000 m2 greenhouses
VEK Adviesgroep was responsible for the design of the hall, office building (toilets, offices, canteen, changing room), greenhouse and its equipment, including boiler room and co-generation installation of 10.2 MW-e. VEK Adviesgroep supervised the whole process, including planning, design (architecture), engineering, tendering & contracting.
Westland, the Netherlands
tomato
105,000 m2 (2003)
80,000 m2 (2004)
38,000 m2 (2007)
24,000 m2 (2009)
4,000 m2 packing building
4 gas engines, 8.4 MW-e in 2005;
5th engine of 3.0 MW-e in 2006
2002-2004;
turnkey
1st phase in 2002-2003
2nd phase in 2004
3rd phase in 2007
4th phase in 2009
1st phase in 2002-2003
2nd phase in 2004
3rd phase in 2007
4th phase in 2009